Fig.3-32 Comparison of detritiation system concept using catalyst and bacteria
The conventional system requires catalytic reactor to always be at high temperature, so capital & operation cost is high, and the replaced catalyst becomes tritiated waste. The new system can be operated at room temperature. The bio-reactor cost will be about 1/10 that of the catalyst set. Bio-reactor can be burnt for waste minimization.
Go back by your web browser, or click the right button. « Close