Fig.12-22 Conceptual design of MIU, location of the post-excavation grouting experiment in red (GL-140~ - 148 m). Depth of shafts as of March 2007.
Fig.12-23 Geological description and borehole layout for the post-grouting (Red area in Fig.12-22)
Go back by your web browser, or click the right button. « Close