Fig.14-22 Quantity of injected cement per unit length of the pre-excavation grouting at the Ventilation Shaft niche (boring area)

Fig.14-22 Quantity of injected cement per unit length of the pre-excavation grouting at the Ventilation Shaft niche (boring area)

At the end of the Ventilation Shaft niche (boring area), the excavation confirmed a large volume of injected cement.