Inside the experimental building, where the space to carry out work on the main body of JT-60 was secured after preliminary dismantling work progressed (upper) 
Inside the experimental building, where the space to carry out work on the main body of JT-60 was secured after preliminary dismantling work progressed (upper)
The first production of a superconducting conductor (450 m long) for JT-60SA, wound onto a drum 3 m in diameter (lower)


Go back by your web browser, or click the right button.« Close