Fig.1-23 Decontaminated playground lot and air radiation dose rate monitoring posts
The playground equipment was wiped off using paper towels. Surface soil was removed and the area was backfilled with clean soil. Side gutters were washed with a scrubbing brush and high-pressure water jet. The white 2 × 2 m lattice in the photograph and circles in the attached drawing (red in the area of decontamination, blue outside) indicate the monitoring points.
Go back by your web browser, or click the right button.« Close