Fig.6-10 Configuration of the HTTR-GT/H2 plant and the helium-gas turbine
Operability-demonstration tests are enabled by increasing the cycle pressure ratio with two turbine units connected end to end at the generator shaft and increasing the turbine efficiency with each turbine unit having a low optimal-expansion ratio.
Go back by your web browser, or click the right button.« Close